Tesla has hired Gary Jiang, an Intel veteran who most recently was responsible for installing equipment and transferring Intel's leading-edge 18A technology process from development fab in Oregon to the company's high-volume fab in Arizona, as spotted by Electrek.co. The appointment marks the first publicly identified senior leadership hire for Elon Musk's semiconductor production project, Terafab, which demonstrates Tesla's effort to build an experienced semiconductor manufacturing organization from the ground up by hiring veterans from other companies.
Tesla poaches an Intel veteran
Gary Jiang joined Tesla in June 2026 after spending over 17 years at Intel, according to his LinkedIn profile. Interestingly, there is little to glean about his current role from his LinkedIn profile, aside from noting that he is a director at Tesla. His final position at Intel was as Factory Manager, where he oversaw the construction of the production facility, the installation of fabrication equipment, factory startup, product certification, preparation for high-volume manufacturing, and, ultimately, the transfer of Intel 18A technology from the development fab in Oregon to high-volume Fab 52 in Arizona.
Earlier in his Intel career, Jiang held multiple management positions at the company's Ocotillo campus in Chandler, Arizona, where he managed technician teams accountable for startup, ramp, yield, and output for 22nm, 14nm, and 10nm-class process technologies (which include Intel 10nm SuperFin and 10nm Enhanced SuperFin/ Intel 7) at Fab 32 and Fab 42.
Latest Videos From Watch full video here:
Tesla has been looking for a Technical Program Manager (TPM) for semiconductor infrastructure, focused on end-to-end fab program delivery, since March, but without any success, as the job listing is still listed on the company's website. Therefore, Terafab — the joint initiative between Tesla, SpaceX, and xAI — still does not have a formal leader who is going to lead the whole project.
In his most recent role at Intel, Gary Jiang worked closely with supply chain, finance, and materials logistics for new factory planning for output, wafer cost, yield, and profit & loss, according to his LinkedIn profile. He also managed the billion-dollar capital equipment and startup of the fab. Hence, without any doubt, Jiang appears to have been one of the senior manufacturing leaders responsible for building and equipping Intel's new 18A-capable manufacturing facilities in Arizona (primarily Fab 52, and potentially Fab 62 as the campus expands). However, it would still be inaccurate to say he was the person responsible for building Fab 52 alone.
Jiang's skills roughly match what one would expect from a senior manufacturing executive helping commission a new leading-edge fab, so he will be instrumental in turning a newly constructed fab shell (or even cleanroom) into a production-ready semiconductor manufacturing facility.
However, he did not oversee the entire Fab 52/Fab 62 program and was not responsible for every stage of the project — from permitting and groundbreaking to construction, tool installation, and the ramp to high-volume manufacturing. Likewise, he is unlikely to lead the Terafab project as a whole. Nonetheless, given that Terafab is set to license Intel's 14A process technology, Gary Jiang is probably among the best candidates to equip a fab for an Intel manufacturing node.
Stay On the Cutting Edge: Get the Tom's Hardware Newsletter Get Tom's Hardware's best news and in-depth reviews, straight to your inbox. Contact me with news and offers from other Future brands Receive email from us on behalf of our trusted partners or sponsors
... continue reading