IEEE Spectrum published a sponsored white paper from Hendrix by Marmon Utility examining how covered, spacer-supported overhead conductors behave near substation exits, where many feeders converge and a single fault risk affects multiple circuits. The paper covers thermal ratings, protection, grounding, structural and insulation-coordination requirements, and compares this approach with conventional bare overhead lines and underground shielded cable.
content.knowledgehub.wiley.com
· 2026-09-24
Google offers ChromeOS Flex, a free operating system that can replace Windows on older machines meeting modest specs: an Intel or AMD CPU, 4GB RAM and 16GB storage, though chips from 2012 or earlier aren't supported. Installation involves using Chrome's Chromebook Recovery Utility to create bootable media on an 8GB-plus USB drive, then booting the target PC into its boot menu to install or trial the OS.
engadget.com
· 2026-09-21
US energy storage set another quarterly record, powered largely by seven new gigascale battery installations exceeding one gigawatt-hour each, according to a report from Benchmark Mineral Intelligence and the Solar Energy Industries Association. Behind-the-meter batteries also grew, with data centers accounting for roughly three-quarters of new commercial installations, even as residential battery installations are projected to fall 16% in 2026 after a supporting tax credit expired in 2025.
technologyreview.com
· 2026-09-09
Josh Mackanic, a former Pacific Gas and Electric engineer, founded CivilGrid in 2020 after experiencing costly delays caused by unknown buried pipes during excavation projects. The startup aggregates data on utility lines, property ownership, and environmental regulations into a unified underground mapping platform, and has now raised a $26 million Series A led by Spark Capital, with participation from Afore, A*, Ford Street Ventures, SNR, and Energy Impact Partners.
techcrunch.com
· 2026-08-27
An industry commentary argues that data center providers can no longer treat energy access as a late-stage formality. With surplus grid capacity disappearing, the piece calls for providers to engage utilities earlier and plan for long-term power partnerships rather than opportunistic siting.
fastcompany.com
· 2026-08-26
Fervo Energy is launching its first utility-scale power plant, aiming to prove that enhanced geothermal technology can produce reliable, round-the-clock clean energy at commercial scale. The project follows a period in which geothermal has lagged far behind solar and wind as a share of the renewable energy mix.
fastcompany.com
· 2026-08-25